
list of awarded results
first awards | |
1 |
on improving the lancing quality for ordinary concrete pavements |
2 |
to improve the quality of square frame column with new type of stiffening pieces |
second awards | |
1 |
the causes of moisture regain and peeling of coating layers on toilet walls |
2 |
improve acceptance rate for filled wall masonry works |
3 |
reinforcement for prestressed tubular pile head |
4 |
disposable enhancing the qualified rate of flexible pipe backfilling work |
5 |
enhancing the quality of electroslag pressure welding works |
third awards | |
1 |
improving the erection quality of the homogeneous fire insulation boards |
2 |
reducing the settlement of backfill earth to improve the quality of backfill works |
3 |
how to dispose of the random cracking in roof waterproof protective layers caused by improper construction |
4 |
improving the verticality and flatness of special-shaped columns and shear walls |
5 |
prevent from bubble surface / hollow root in concrete by aluminum alloy formwork |